13 Jan 2014
Jump to navigation
Jump to search
Roshan
- FHgFS on ARM results / blog entry needed
- ARM system for CDAC - must get resolved in the next week
- Work with locuz, dp to send mail
- chase ashok on lustre configuration for 25TB solution
- mellanox vsa blog post
Michael
- bright migration almost complete, reboot required.
- lustre training for roshan and tech team after intel training
Dave
- Get access to a Phi system from intel