Univa
- Finished testing
- Wiki todo, Blog todo
- Aim to complete by next week
OpenNebula
- Problems with libvirt on the VMs
- Testing based around x86
- Work to continue
FhGFS
- To be continued
- Lets try and wrap up next week
VSA
- Setup on blade 7-10
- Blade7 IB Issue
- Blade8 VSA instances
- License provided only allows for 2 systems,
- Cluster setup, master and standby (failover; to test)
- VSA instance on a server (blade8) added blade9
- Blade7, reinstall vsphere
- Roshan to tests VSA conencted to Vmware also
- Performance tests to be done next week
Training
- Dave to send through some initial slides
- Roshan to confirm dates
HiPC
- proposal sent to kalyana
- Roshan to speak to Nvidia about CUDA coding comp
Current deals and Testing
- Iser disqualified, Cray, IBM and HP only ones got through
- Tifr; benchmarking - raise clarification ; speak to Anusuya about this
- Way2Wealth - ARM and HFT box testing ; Mike to setup accounts
- Numascale: Dave requested another slot, Roshan to mail Oommen
Mellanox Updates
- Dave to provied slides on mellanox
Ivy Bridge
- See if Mike can take the E5-2690v2 (thermals, will thermals be ok)
Owncloud
- working , wiki updated
- mike, can we get client working remotely?
- can mike see if you can working remotely, add instructiosn wiki regardless on client
Hepspec
- Hepspec blog post
- Mike bostonlabs blog
Blogs
- Roshan account on low power servers
System testing
- OCF testing ; ConnectIB
Hortonworks
- Roshan; take a look at hortonworks and their offering